BUY WITH CONFIDENCE! FREE SIZE EXCHANGES. SHOP NOW

EXCHANGE ORDER - SIZE

$000
Shipping calculated at checkout.
Difference from original LENGTH ordered
Difference from original WIDTH ordered


More Information

Lead Time: Standard Lead Time. 18-35 Weeks
Water Resistance:
Flexibility:
NFPA Certified: N/A
Last:
Boot Height:
ASTM F2413-18 M/I/C Rated:
EH Rated:
Toe Style: N/A
Toe Structure:
Sole Stitching Thread:
Outsole:
Heel Profile:
Edge Color: Match Upper
Rebuildable:
Resole-able:

SIZE CHART

UK Size US Mens Nicks Min Foot Length MM Max Foot Length MM Min Foot Length IN Max Foot Length IN
3.54.54220.2224.48.6692913398.834645669
454.5224.5228.68.8385826779
4.55.55228.7232.89.0039370089.165354331
565.5232.9237.19.1692913399.334645669
5.56.56237.2241.39.3385826779.5
676.5241.4245.59.5039370089.665354331
6.57.57245.6249.89.6692913399.834645669
787.5249.92549.83858267710
7.58.58254.1258.210.0039370110.16535433
898.5258.3262.510.1692913410.33464567
8.59.59262.6266.710.3385826810.5
9109.5266.8270.910.5039370110.66535433
9.510.510271275.210.6692913410.83464567
101110.5275.3279.410.8385826811
10.511.511279.5283.611.0039370111.16535433
111211.5283.7287.911.1692913411.33464567
11.512.512288292.111.3385826811.5
121312.5292.2296.311.5039370111.66535433
12.513.513296.4300.611.6692913411.83464567
131413.5300.7304.811.8385826812
13.514.514304.9305.112.0039370112.01181102